In January 2019, construction and technical inspection of the first section from the modernization of the Sava river dikes project – at the Klakar-Ruščića section covering the length of 5100 meters – was completed. The completion of this section was the final part between the western lateral channel of Biđ-Bosutsko polje and the Glogovice channel which provides protection for 2911 inhabitants against the harmful effects of water.
Hydrological measurements
In January 2019, construction and technical inspection of the first section from the modernization of the Sava river dikes project – at the Klakar-Ruščića section covering the length of 5100 meters – was completed. The completion of this section was the final part between the western lateral channel of Biđ-Bosutsko polje and the Glogovice channel which provides protection for 2911 inhabitants against the harmful effects of water.
Regional conference on environmental impact assessment
In January 2019, construction and technical inspection of the first section from the modernization of the Sava river dikes project – at the Klakar-Ruščića section covering the length of 5100 meters – was completed. The completion of this section was the final part between the western lateral channel of Biđ-Bosutsko polje and the Glogovice channel which provides protection for 2911 inhabitants against the harmful effects of water.
Modernisation of the Sava river dikes from Račinovci to Nova Gradiška, the Klakar-Ruščica Section
In January 2019, construction and technical inspection of the first section from the modernization of the Sava river dikes project – at the Klakar-Ruščića section covering the length of 5100 meters – was completed. The completion of this section was the final part between the western lateral channel of Biđ-Bosutsko polje and the Glogovice channel which provides protection for 2911 inhabitants against the harmful effects of water.
Preparation of the survey map for the EU project Modernisation of the Sava river dikes from Račinovci to Nova Gradiška – Services involving geodetic and aerial photogrammetric measurements
The largest infrastructural linear project surveyed using an unmanned aerial vehicle in the world carried out in Croatia
The area along the left foreshore of Sava River from Račinovci (rkm 212.080) to the Trnava confluence at Nova Gradiška (rkm 464.500) is protected against floods by a continual line of river dikes covering the total length of 236 km.
Bathymetric survey of the Sava River for the waterway from Belgrade to Brčko
Upon drafting the project, a georeferencing video of the Sava River was created covering the respective section and a geoid model for the project area.
The call for drafting bids for the project “Undertaking of Preparatory works, Drafting of the Main Design and Tender Documentation for Construction Permits for Renewal of the Waterway on the Sava River up to Class Va from Belgrade to Brčko (rkm0.0-rkm234.0)” was published and issued by the Ministry of Transport and Communication of the Republic of Bosnia and Herzegovina on 24 May 2012. The company Vodoprivredno-projektni biro d.d. from Zagreb in a consortium with the company IGH d.d. also from Zagreb was selected as the most favourable bidder and based on the mentioned bid, the contract was signed on 20 September 2013 between the mentioned parties.
Approval of the EU grant for the project Modernisation of the Sava river dikes from Račinovci to Nova Gradiška
Study documentation and an application for registering the largest infrastructural project for protection against the harmful action of water in the last decade were prepared for the Hrvatske vode, as the contracting authority and investor.
EU project for improving the Srednje posavlje flood protection system
The EU co-financed study documentation was completed for Hrvatske vode (Croatian Waters), as the end-user, relating to the largest system of flood control in the Republic of Croatia. The project covers the central protected region of the Republic of Croatia along the Sava River over an area of 800 square kilometres.
The Bosut “river without a source” finally connected to the Sava River
It involves the largest national project for irrigation and multi-purpose utilisation of water, construction of a supply melioration channel for irrigating the Biđ-Bosutsko field in the Brod-Posavina and Vukovar-Srijem Counties. Upon completing the construction, the large mechanism was put into operation which enables irrigation of up to 7,000 ha of the Biđ-Bosutsko field.
Pilot project for irrigating woody plants on utilized karst areas
Ensuring ample quantities of water from depleted aquifers specifically for irrigation of agricultural crops grown on karst surfaces represents a scientific and professional challenge. From the idea of obtaining a construction permit, preparation of the Donje Polje – Jadrtovac public irrigation project was successfully finalised on 274 ha, close to Vrpolje near Šibenik.