Measure 4.3.1 is directed towards the construction of public irrigation systems leading to private lots and the reduction of adverse environmental effects caused by climate conditions (droughts). VPB contracted and successfully completed study documentation for co-financing from EU agricultural funds for rural development relating to four public irrigation systems: Orubica (326 ha) in the Brod – Posavina County, Đolta (161 ha) in the Virovitica – Podravina County, Lišansko polje (232 ha) in the Zadar County and Glog (310 ha) in the Dubrovnik-Neretva County. The investment value of the public irrigation project is about 15 million euros, each. Investors for the systems are local and regional government bodies, i.e., counties, with Hrvatske vode as the intermediary.
Related items
Reconstruction Design of the Youth Town Complex
In January 2019, construction and technical inspection of the first section from the modernization of the Sava river dikes project – at the Klakar-Ruščića section covering the length of 5100 meters – was completed. The completion of this section was the final part between the western lateral channel of Biđ-Bosutsko polje and the Glogovice channel which provides protection for 2911 inhabitants against the harmful effects of water.
Kopački Rit–Topographic Survey Report
In January 2019, construction and technical inspection of the first section from the modernization of the Sava river dikes project – at the Klakar-Ruščića section covering the length of 5100 meters – was completed. The completion of this section was the final part between the western lateral channel of Biđ-Bosutsko polje and the Glogovice channel which provides protection for 2911 inhabitants against the harmful effects of water.
„Project of Improvement of Water and Wastewater Infrastructure of the Bjelovar Agglomeration for EU Co-Financing”
In January 2019, construction and technical inspection of the first section from the modernization of the Sava river dikes project – at the Klakar-Ruščića section covering the length of 5100 meters – was completed. The completion of this section was the final part between the western lateral channel of Biđ-Bosutsko polje and the Glogovice channel which provides protection for 2911 inhabitants against the harmful effects of water.